We design and build increasingly ambitious design-build projects, nationally and internationally. We are tooled with highly sophisticated equipment for the building of bridges and box culverts. BUNS has already executed 20 bridges in Cameroon. Our longest bridge is still under construction in the Manki - Magba project with a total length of __________.