Need help? (237) 222 31 52 75

Engineering Structures

Construction of a double box culvert in the Zoatele project, Cameroon. Reinforcement and formwork of the floor or raft of the box culvert.

Concrete testing during culvert construction

We design and build increasingly ambitious design-build projects, nationally and internationally. We are tooled with highly sophisticated equipment for the building of bridges and box culverts. BUNS has already executed 20 bridges in Cameroon. Our longest bridge is still under construction in the Manki - Magba project with a total length of __________.